{"id":17574,"date":"2016-07-12T11:07:31","date_gmt":"2016-07-12T09:07:31","guid":{"rendered":"https:\/\/delta-engineering.be\/?p=17574"},"modified":"2016-07-12T13:11:46","modified_gmt":"2016-07-12T11:11:46","slug":"pressure-decay-leak-testing","status":"publish","type":"post","link":"https:\/\/marketing.delta-engineering.be\/delta\/pressure-decay-leak-testing","title":{"rendered":"Pressure decay leak testing, room for improvement"},"content":{"rendered":"<p><b>PRESSURE DECAY LEAK TESTING : THE FACTS<\/b><\/p>\n<p>Delta Engineering noticed that a lot of leak testers are misadjusted a production environment. As a result of that, a significant amount could be falsely rejected, or even worse bad bottles pass through.<\/p>\n<p>We can state : The cost of a leak tester is not buying it, but the amount of false rejects it causes every day. <\/p>\n<p>Imagine the cost of a bottle is 0,11\u00e2\u201a\u00ac on a machine running at 1100 BPH running 7800 hours per year : every % of product loss (false rejects, etc.) is costing 10.000\u00e2\u201a\u00ac \/ year. A multiple of the capital investment of the unit. <\/p>\n<p><b>COMMON MISTAKES<\/b><\/p>\n<p class=\"dprotected dprotected-generic\"><a href=\"#login_panel\" data-rel=\"prettyPhoto[login_panel]\">Protected content, please log in<\/a><\/p> <a  href=\"#login_panel\" data-rel=\"prettyPhoto[login_panel];\" class=\"scrolltotop\">Please <b><u>log-in \/ register<\/u><\/b> in order to see this content<\/a>\n","protected":false},"excerpt":{"rendered":"<p>PRESSURE DECAY LEAK TESTING : THE FACTS<\/p>\n<p>Delta Engineering noticed that a lot of leak testers are misadjusted a production environment. As a result of that, a significant amount could be falsely rejected, or even worse bad bottles pass through.<\/p>\n","protected":false},"author":1688,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[915],"tags":[],"_links":{"self":[{"href":"https:\/\/marketing.delta-engineering.be\/delta\/wp-json\/wp\/v2\/posts\/17574"}],"collection":[{"href":"https:\/\/marketing.delta-engineering.be\/delta\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/marketing.delta-engineering.be\/delta\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/marketing.delta-engineering.be\/delta\/wp-json\/wp\/v2\/users\/1688"}],"replies":[{"embeddable":true,"href":"https:\/\/marketing.delta-engineering.be\/delta\/wp-json\/wp\/v2\/comments?post=17574"}],"version-history":[{"count":4,"href":"https:\/\/marketing.delta-engineering.be\/delta\/wp-json\/wp\/v2\/posts\/17574\/revisions"}],"predecessor-version":[{"id":17579,"href":"https:\/\/marketing.delta-engineering.be\/delta\/wp-json\/wp\/v2\/posts\/17574\/revisions\/17579"}],"wp:attachment":[{"href":"https:\/\/marketing.delta-engineering.be\/delta\/wp-json\/wp\/v2\/media?parent=17574"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/marketing.delta-engineering.be\/delta\/wp-json\/wp\/v2\/categories?post=17574"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/marketing.delta-engineering.be\/delta\/wp-json\/wp\/v2\/tags?post=17574"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}